Before the actual handrail installation begins, there’s a pre-installation phase that requires careful planning and preparation. This phase ensures everything goes smoothly once the materials arrive on-site. During this time, measurements are taken, designs are finalized, and the materials are ordered or fabricated.
If you’re choosing custom railings, the fabrication process can take anywhere from a few days to a few weeks, depending on the complexity of the design and the materials being used. For standard, off-the-shelf systems, you’ll skip this fabrication wait time and jump directly to installation.
Another important aspect of the pre-installation process is ensuring that all necessary permits and approvals are in place. Some railing systems—particularly those in commercial buildings or multi-family residences—may require specific permits or inspections, which could add time to the overall process, depending on your location.